top of page


Thane Coastal Road Phase 2: MMRDA Seeks CRZ Clearance for Balkum–Anandnagar Corridor
Thane Coastal Road Phase 2: MMRDA Seeks CRZ Clearance for Balkum–Anandnagar Corridor, a key project planned to strengthen signal-free connectivity between Mulund, Thane and Gaimukh.

Ajjay Bhagyakar
Aug 43 min read


Polluted creek water entering DPS Flamingo Lake is threat to Navi Mumbai’s wetlands: study
Polluted creek water entering DPS Flamingo Lake is threat to Navi Mumbai’s wetlands: study, raising concerns over water quality, biodiversity, and conservation.

Ajjay Bhagyakar
Jun 282 min read

bottom of page
