top of page


Pune-Mumbai Expressway 10-Laning Faces Delay As MSRDC Ordered To Conduct Fresh Surveys Before Expansion
Pune-Mumbai Expressway 10-Laning Faces Delay As MSRDC Ordered To Conduct Fresh Surveys Before Expansion. The ₹14,260-crore project to widen the 94.6-km expressway from six to 10 lanes is likely to be delayed after MSRDC was directed to conduct fresh surveys. The additional assessment may push back approvals and construction, despite rising traffic pressure on the Mumbai–Pune corridor.

Ajjay Bhagyakar
2 days ago2 min read


Changing City: Expansion work on old Mumbai-Nashik highway set for completion by February 2025
Expansion work on the old Mumbai-Nashik highway between Vadpe and Majiwada is set for completion, promising faster travel and reduced congestion.

Ajjay Bhagyakar
Jul 102 min read


Monsoon Halts Rs7000 Crore Mumbai–Pune Expressway Missing Link Days After Launch
Monsoon halts Rs7000 crore Mumbai–Pune Expressway Missing Link days after launch as heavy rainfall and landslides disrupt traffic operations.

Ajjay Bhagyakar
Jul 103 min read

bottom of page
