Maharashtra’s Mega Leap: ₹6,363 Crore Elevated Road to Navi Mumbai International Airport Gets Cabinet Approval
- Ajjay Bhagyakar

- Sep 5
- 3 min read
Author: Ajjay Bhagyakar Source: NewsBand

A New Era of Connectivity
Imagine reaching the upcoming Navi Mumbai International Airport (NMIA) from Thane in just 30 minutes—a journey that today takes nearly 90 minutes battling traffic. Maharashtra has just made that dream a reality!
The state cabinet has approved a ₹6,363 crore, 25-km elevated road project that will transform the way millions travel across Mumbai Metropolitan Region (MMR). This is more than just a road—it’s a gateway to growth, speed, and global connectivity.
The Grand Plan
Six-lane elevated expressway covering 25 km
Six major interchanges for easy entry and exit
Design speed: 100 km/h for quick, safe travel
Travel time cut: 90 minutes → 30 minutes
Execution agency: CIDCO, under the PPP model
This ambitious corridor is designed not only to serve airport passengers but also to decongest the region’s existing arterial routes, benefitting lakhs of daily commuters.
The Toll Talk
Of course, convenience comes at a price. The toll fee is expected at ₹365 one-way—higher than the iconic Atal Setu bridge (₹250). While some may find it steep, the time savings and fuel efficiency more than balance the cost. Plus, regular toll revisions will ensure financial sustainability of the project.
Why It Matters
Boost to Navi Mumbai International AirportNMIA is poised to become India’s second-largest airport, easing pressure on Mumbai’s CSMIA. This elevated road will make it easily accessible from Thane, Kalyan, Dombivli, Ambernath-Badlapur, and beyond.
Economic MultiplierCIDCO has been authorized to develop land beneath and alongside the corridor, paving the way for commercial hubs, logistics parks, and real estate growth.
Urban DecongestionBy offering a direct, high-speed alternative, the road will reduce bottlenecks on Eastern Express Highway and Thane-Belapur Road, making travel smoother for all.
Timeline & Challenges
CIDCO has six months to secure environmental and regulatory clearances. Once approvals are in hand, the elevated corridor is expected to be ready in three years.
However, land acquisition, permissions, and urban density could test the pace of execution. If managed well, this project could become a benchmark for India’s future mobility planning.
Not Just a Road—A Lifeline
Think about this:
A family catching an international flight from NMIA no longer needs to leave hours early.
Businesses can move goods faster, improving supply chains.
Residents of Thane, Kalyan, and beyond will feel closer to Mumbai’s global gateway than ever before.
This is why the elevated road is being hailed as a lifeline of connectivity—a project that will change everyday lives.
Part of a Bigger Picture
The cabinet didn’t stop here. Alongside the elevated road, it also gave nods to:
Metro Line 11: 16-km underground stretch from Wadala to CSMT.
Railway upgrades on Pune-Lonavala route.
Metro extensions in Pune.
Clearly, Maharashtra is building a multi-modal transport ecosystem where roads, railways, and metros integrate seamlessly.
Maharashtra’s Bold Vision
This corridor is more than an engineering feat—it’s a statement of intent. Maharashtra wants to lead India’s infrastructure revolution with projects that are:
Fast (cutting travel times)
Smart (using PPP models and digital systems)
Sustainable (integrating planned commercial development)
As NMIA gears up to welcome millions of passengers every year, this elevated corridor ensures the world will see a new, world-class face of India the moment they land.
✨Conclusion
The ₹6,363 crore Thane–NMIA elevated road is not just another highway—it’s the future of urban mobility in Maharashtra. With faster travel, new commercial opportunities, and integrated infrastructure, it sets the stage for Navi Mumbai’s emergence as a global hub for trade, travel, and transformation.
From reducing airport commutes to sparking economic corridors, this project is a game-changer—proof that when India builds, it builds big, bold, and future-ready.
%20(1)%20(1).png)




Comments