top of page


SCLR Phase 2 Inaugurated Mumbai Gets Faster East–West Connectivity
SCLR Phase 2 Inaugurated Mumbai Gets Faster East–West Connectivity with the opening of the final 1.40-km elevated corridor between Bharat Nagar Road and Vakola Junction. The completed SCLR network now strengthens the connection between the Eastern and Western Express Highways through BKC, Kurla, Kalina and Chembur, while the integrated corridor is expected to reduce travel time by up to 35 minutes.

Griha Realty
Aug 152 min read


Shilphata, Kalyan Phata's Killer Traffic To End? Airoli Elevated Road Cuts 45-Minute Drive To 15
Shilphata, Kalyan Phata's Killer Traffic To End? Airoli Elevated Road Cuts 45-Minute Drive To 15, bringing faster travel and better connectivity.

Ajjay Bhagyakar
Jun 292 min read

bottom of page
