top of page


Thane Coastal Road-1 Crosses 40Pct Completion Milestone in 14 Months
Thane Coastal Road-1 Crosses 40Pct Completion Milestone in 14 Months, with 77% piling and 501 I-girders completed. The 13.45-km corridor aims to ease Ghodbunder Road congestion and improve connectivity across Thane and MMR.

Griha Realty
Sep 102 min read


Monsoon Revival in India: Bay of Bengal Low-Pressure System Set to Boost Rainfall Across the Country
Monsoon Revival in India: Bay of Bengal Low-Pressure System Set to Boost Rainfall Across the Country as a fresh low-pressure area is expected to strengthen the southwest monsoon, bringing widespread rain, improving reservoir levels, and supporting agriculture across multiple states.

Ajjay Bhagyakar
Jul 182 min read


LPG vessel Shivalik arrives at Gujarat's Mundra Port after crossing Strait of Hormuz
LPG vessel Shivalik arrives at Gujarat's Mundra Port after crossing Strait of Hormuz, delivering 46,000 tonnes of LPG to strengthen India’s energy supply and ensure uninterrupted fuel availability.

Ajjay Bhagyakar
Mar 172 min read

bottom of page
