Under-Construction: The Underground Bullet Train Terminal at Bandra Kurla Complex (BKC), Mumbai
- Ajjay Bhagyakar

- 5 days ago
- 2 min read
Author: Ajjay Bhagyakar | Published by: Griha Realty | Source: X ( Indian Infra )
Corporation Limited (via multiple media reports & social media update)
The Vision & Scope
The future high-speed rail terminal at BKC — officially the Bandra Kurla Complex high‑speed railway station — is being built as part of the Mumbai–Ahmedabad High‑Speed Rail Corridor (MAHSR). Wikipedia+2Wikipedia+2
This station is planned to be underground, situated in one of Mumbai’s principal business districts. Wikipedia+1
It will serve as the southern terminus of the corridor in Mumbai. Wikipedia+1
The contract for the station construction (Package C1) was awarded to a joint venture of Megha Engineering & Infrastructure Limited (MEIL) and Hindustan Construction Company (HCC) in December 2022. Wikipedia
The deadline for completion of the station is March 2028. Wikipedia
Construction Progress & Key Developments
Here’s a snapshot of how things are shaping up:
According to the station status page: “The primary ongoing activity at the construction site is the installation of secant piles… more than 3,300 secant piles, each 17-21 metres deep, are being installed using 14 dedicated piling rigs.” Wikipedia
Connectivity enhancements are also underway: For example, a 1.4-km pedestrian subway at BKC is being planned to link the station with surrounding Metro / commercial hubs. The Daily Jagran+1
The broader MAHSR corridor is reporting milestones such as hundreds of kilometres of viaducts completed, supporting the fact that major works are advancing. Wikipedia+1
What This Means for BKC & Mumbai
The arrival of a bullet-train terminal in BKC will further elevate the district’s status as a high-end commercial and transit hub.
Integration with local transport (Metro, subways) will enhance last-mile connectivity — the planned 1.4 km subway is one such connector.
Real-estate and commercial prospects in the zone around BKC are expected to benefit, given the premium infrastructure.
For commuters and travellers, having a high-speed rail gateway right in the city’s core means faster access to the north-western corridor (Ahmedabad) in the years ahead.
Challenges & Watch-Points
Building an underground station in a dense urban zone like BKC comes with complex engineering (deep excavation, utility shifts, piling), which the project documents confirm.
Although this terminal is targeted for 2028, some analysts estimate that full corridor operations may stretch beyond that. The Metro Rail Guy
Effective connectivity to feeder transport modes (Metro, buses, pedestrian links) will be key to the station’s success. The subway link is a positive sign.
Final Word ( Under-Construction: The Underground Bullet Train Terminal at Bandra Kurla Complex (BKC), Mumbai )
Under-Construction: The Underground Bullet Train Terminal at Bandra Kurla Complex (BKC), Mumbai The BKC bullet-train station is a landmark infrastructure undertaking. With a 2028 completion timeline, steady progress on foundational works, and connectivity enhancements under way, the project is charting the path toward transforming one of Mumbai’s busiest business zones. For investors, urban planners and regular commuters alike, this is a development worth watching — the era of high-speed rail reaching right into the city core is edging closer.
%20(1)%20(1).png)









Comments