top of page


Mumbai Ring Roads Master Plan 10 Ring Roads to Create One Connected MMR
Mumbai Ring Roads Master Plan 10 Ring Roads to Create One Connected MMR aims to integrate roads, tunnels, sea links and expressways for seamless regional connectivity.

Griha Realty
7 days ago2 min read


India Housing Construction Value Rises to USD430 Billion in 2025 from USD235 Billion in 2019 CREDAI-Anarock Report
India Housing Construction Value Rises to USD430 Billion in 2025 from USD235 Billion in 2019, highlighting strong growth in the residential real estate sector, according to the CREDAI-Anarock report.

Griha Realty
Oct 52 min read


Rs61500 Crore Highway Corridor to Connect Siliguri Guwahati and Shillong
Rs 61500 Crore Highway Corridor to Connect Siliguri Guwahati and Shillong will strengthen Northeast connectivity, reduce travel time and improve regional infrastructure.

Griha Realty
Oct 12 min read


Mumbai Airport Airlines Standoff Continues as Navi Mumbai Airport Shift Nears
Mumbai Airport airlines standoff continues as Navi Mumbai Airport shift nears, with airlines yet to confirm international flight transfers ahead of T1 redevelopment.

Griha Realty
Sep 242 min read


Navi Mumbai Airport Seeks US Pre-Clearance Facility A New Step Towards Global Connectivity
Navi Mumbai Airport Seeks US Pre-Clearance Facility, a proposed move that could streamline US-bound passenger processing and strengthen NMIA’s role as a major international aviation hub.

Griha Realty
Sep 242 min read


Puravankara Secures Rs2600 Crore Redevelopment Project in Mumbai
Puravankara secures a ₹2,600 crore redevelopment project in Mumbai’s Goregaon West, covering three residential societies across 4.68 acres with approximately 1.05 million sq. ft. of development potential.

Griha Realty
Sep 242 min read


GROHE Hurun India Real Estate Leadership Conclave & Excellence Awards 2026 Celebrates India’s Real Estate Leaders
GROHE Hurun India Real Estate Leadership Conclave & Excellence Awards 2026 Celebrates India’s Real Estate Leaders, recognising excellence, innovation and leadership shaping India’s evolving real estate and urban development landscape.

Griha Realty
Sep 172 min read


Hinjewadi Metro to Start by September-End, 17 Stations Expected to Open
Hinjewadi Metro to Start by September-End, 17 Stations Expected to Open, connecting Pune’s major IT hub with the city and offering commuters a faster alternative to road travel.

Griha Realty
Sep 162 min read


Thane Coastal Road-1 Crosses 40Pct Completion Milestone in 14 Months
Thane Coastal Road-1 Crosses 40Pct Completion Milestone in 14 Months, with 77% piling and 501 I-girders completed. The 13.45-km corridor aims to ease Ghodbunder Road congestion and improve connectivity across Thane and MMR.

Griha Realty
Sep 102 min read


Third Mumbai Pune Expressway hits another roadblock tender for first phase pushed to October 1
Third Mumbai Pune Expressway hits another roadblock tender for first phase pushed to October 1, adding another delay to the ambitious high-speed corridor planned between Mumbai and Pune. The first-phase tender has been extended amid pending land acquisition and other clearances, potentially pushing back the start of construction. The project is expected to strengthen connectivity between Mumbai, Navi Mumbai and Pune, while supporting future growth in logistics, business and r

Ajjay Bhagyakar
Sep 82 min read


Pune-Mumbai Expressway 10-Laning Faces Delay As MSRDC Ordered To Conduct Fresh Surveys Before Expansion
Pune-Mumbai Expressway 10-Laning Faces Delay As MSRDC Ordered To Conduct Fresh Surveys Before Expansion. The ₹14,260-crore project to widen the 94.6-km expressway from six to 10 lanes is likely to be delayed after MSRDC was directed to conduct fresh surveys. The additional assessment may push back approvals and construction, despite rising traffic pressure on the Mumbai–Pune corridor.

Ajjay Bhagyakar
Sep 22 min read


Mumbai 3 On The Cards All About The Proposed Rs 4000-Crore Mega City
Mumbai 3 On The Cards All About The Proposed Rs 4000-Crore Mega City explores the ambitious Karnala-Sai-Chirner New Town planned across 323.44 sq. km and 124 villages in Raigad. With ₹4,000 crore earmarked for 2026–27 and strategic connectivity through Atal Setu and Navi Mumbai International Airport, Mumbai 3.0 could emerge as a major new hub for housing, technology, logistics, business and infrastructure.

Ajjay Bhagyakar
Aug 222 min read


Mahindra Lifespaces inks Rs142 crore agreement for housing society redevelopment in Mumbais Chembur
Mahindra Lifespaces inks Rs142 crore agreement for housing society redevelopment in Mumbais Chembur, marking another significant move in the city’s growing redevelopment market. The project involves the redevelopment of a nine-building housing society spread across nearly 2.5 acres, with 133 existing members set to receive new homes and improved living spaces.

Ajjay Bhagyakar
Aug 222 min read


BMC Rs702 Crore Underground Walkway Could Transform Mumbais Pedestrian Connectivity
BMC Rs702.4 Crore Underground Walkway Could Transform Mumbais Pedestrian Connectivity by creating a direct underground link between the Science Centre Metro Line 3 station and the Worli Promenade via Mahalaxmi Racecourse. The project aims to improve last-mile access, reduce dependence on short vehicle trips and connect Metro commuters to Mumbai’s Coastal Road, public spaces and waterfront. BMC’s Standing Committee has approved the funding, with MMRC set to execute the project

Ajjay Bhagyakar
Aug 222 min read


BMC plans Rs 702-crore underground walkway beneath Mahalaxmi Racecourse
BMC plans Rs 702-crore underground walkway beneath Mahalaxmi Racecourse, proposing a major 3-km pedestrian corridor linking the Nehru Science Centre Metro station with the Haji Ali Coastal Road promenade. The project is planned to include underground access beneath the Racecourse, escalators, lifts, parking and recreational spaces, creating a more integrated connection between Mumbai Metro, public spaces and the Coastal Road.

Griha Realty
Aug 182 min read


Mumbai rail expansion Kalyan-Badlapur 3rd 4th lines project reaches 52 per cent progress completion targeted for 2028
Mumbai rail expansion Kalyan-Badlapur 3rd 4th lines project reaches 52 per cent progress completion targeted for 2028, marking a major step towards improving capacity on the busy Central Railway corridor. The ₹1,510 crore MUTP-3A project aims to ease congestion, improve operational flexibility and support smoother suburban and long-distance train movement between Kalyan and Badlapur.

Griha Realty
Aug 182 min read


Lodha Developers Plans 21 Housing Launches Across MMR Delhi-NCR Pune And Bengaluru
Lodha Developers Plans 21 Housing Launches Across MMR Delhi-NCR Pune And Bengaluru by March 2027, with a combined estimated revenue potential of ₹24,000 crore. The pipeline includes seven new projects spanning 5.9 million sq. ft. and 14 new phases across existing developments covering 9.7 million sq. ft. The expansion highlights strong housing demand and Lodha’s growing presence across India’s key real estate markets.

Griha Realty
Aug 172 min read


ORA Land launches BluBay in Karjat reinforcing Mumbai 3 0 as a high-growth NRI investment
ORA Land launches BluBay in Karjat reinforcing Mumbai 3 0 as a high-growth NRI investment, as Karjat emerges as a promising destination for GCC-based NRIs seeking connectivity, lifestyle and long-term value. The 60-acre BluBay development features 325 premium villa plots, a 35,000 sq. ft. clubhouse, 60+ lifestyle amenities and a 60,000 sq. ft. lagoon. With Atal Setu, Navi Mumbai International Airport, the Panvel–Karjat Rail Corridor and other major infrastructure projects res

Griha Realty
Aug 152 min read


Third Mumbai Takes Shape: MMRDA Plans Karnala-Sai Chirner New Town from Scratch
Third Mumbai Takes Shape: MMRDA Plans Karnala-Sai Chirner New Town from Scratch as a 323.44 sq. km planned urban centre across 124 villages in Raigad. Backed by Atal Setu and Navi Mumbai International Airport, the ambitious KSC New Town aims to create a new ecosystem of housing, transport, utilities, business and employment. MMRDA is progressing with land-use planning and land acquisition, while Singapore-based Surbana Jurong has been appointed to prepare the master plan for

Ajjay Bhagyakar
Aug 152 min read


SCLR Phase 2 Inaugurated Mumbai Gets Faster East–West Connectivity
SCLR Phase 2 Inaugurated Mumbai Gets Faster East–West Connectivity with the opening of the final 1.40-km elevated corridor between Bharat Nagar Road and Vakola Junction. The completed SCLR network now strengthens the connection between the Eastern and Western Express Highways through BKC, Kurla, Kalina and Chembur, while the integrated corridor is expected to reduce travel time by up to 35 minutes.

Griha Realty
Aug 152 min read

bottom of page
