Ulwe Coastal Road & D.B. Patil Airport Connector Reach 68 percentage Completion
- Ajjay Bhagyakar

- Dec 16, 2025
- 2 min read
Author: Ajjay Bhagyakar | Published by: Griha Realty
Source: x.com
Infrastructure development in Navi Mumbai is gaining strong momentum, with the Ulwe Coastal Road & D.B. Patil Airport connector recording significant construction progress. Recent updates confirm that the project has reached 68% completion, highlighting steady execution on one of the region’s most critical connectivity corridors.
The Ulwe Coastal Road & D.B. Patil Airport connector plays a vital role in linking Ulwe, the Mumbai Trans Harbour Link (Atal Setu), and the upcoming Navi Mumbai International Airport. Once operational, this corridor will enable faster, smoother, and congestion-free access for commuters, airport passengers, and logistics traffic.
The advancement of the Ulwe Coastal Road & D.B. Patil Airport project is expected to significantly reduce travel time, ease pressure on existing arterial roads, and support airport-led economic development. It will also improve connectivity between key residential, commercial, and industrial zones across Navi Mumbai.
From a real estate and urban development perspective, progress on the Ulwe Coastal Road & D.B. Patil Airport connector is likely to drive increased demand in Ulwe, Panvel, and nearby nodes, strengthening Navi Mumbai’s position as a fast-emerging growth hub.
Project Highlights ( Ulwe Coastal Road & D.B. Patil Airport Connector Reach 68percentage Completion )
Overall progress: 68% completed
Direct road connectivity to NMIA via D.B. Patil Airport Connector
Seamless integration with Ulwe Coastal Road
Designed to reduce travel time and ease congestion on existing routes
Why This Project Is Important
Once operational, these roads will:
Enable faster access from South Mumbai and Navi Mumbai to NMIA
Decongest internal city roads and highways
Support airport-led economic development
Boost growth in Ulwe, Panvel, and surrounding nodes
Impact on Real Estate & Urban Development
The progress of the Ulwe Coastal Road and airport connector is expected to accelerate:
Residential and commercial demand in Ulwe and airport-influenced zones
Infrastructure-led property appreciation
Investment interest across Navi Mumbai’s emerging corridors
In Summary
With over two-thirds of the work completed, the Ulwe Coastal Road and D.B. Patil Airport Connector Road are fast shaping Navi Mumbai’s future mobility network, reinforcing the city’s position as a next-generation urban and aviation hub. Ulwe Coastal Road & D.B. Patil Airport
%20(1)%20(1).png)








Comments